PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pour stops at Elev. 5,6 (2nd Floor) Facing West (800x600).jpg Started installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Started underground storm piping between column lines G-G.1 Facing North (800x600).jpg Welding extension beams at Derrick -2 (2nd Floor) Facing West (800x600).jpg After pouring concrete at underground service pipes Facing South (800x600).jpg Backfilling inside Stair -5 pit Facing North (800x600).jpg Building rebar mats for Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Finished installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installed electrical panels on the 2nd floor Facing North (800x600).jpg
Previous pageNext page After pouring concrete at underground service pipes Facing South (800x600)
After pouring concrete at underground service pipes Facing South (800x600)